What should be checked before selecting the MI-370?
Confirm the load, rotating inertia, disc diameter, number of positions, indexing time, motor power, transmission, fixture and machine interface. Final selection depends on application validation.
Official technical sheet · MI Series
The table below reproduces the primary parameters published in the official sheet. For capacities by transmission and specific conditions, consult the PDF and validate the application.
MI-370Published model data
Indicated maximum load
22.500 N
| Max. false table diameter | Ø 2.400 mm |
|---|---|
| Rotation direction | Horário, anti-horário e alternado |
| Number of divisions | 2, 3, 4, 5, 6, 8, 10, 12, 16, 20 ou 24 |
| Voltage | 220 / 380 V |
| Frequency | 60 Hz |
| Motor power | 0,37–3 kW |
| Table mass | 310 kg |
| Accuracy | ± 0° 0’ 45” (0,015 mm) em Ø 100 mm |
| Disc flatness | ± 0,02 mm |
| Max. disc eccentricity | ± 0,02 mm |
| Parallelism relative to base | ± 0,03 mm |
Values according to the supplied official sheet. Final definition requires analysis of load, inertia, fixture and cycle.
COMPLETE OFFICIAL TABLES
The two panels below reproduce the complete official data pages for this model. All values, timing, transmissions and diagrams remain in their original source, without partial transcription.


FAQ
Confirm the load, rotating inertia, disc diameter, number of positions, indexing time, motor power, transmission, fixture and machine interface. Final selection depends on application validation.
No. The values reproduce the published technical sheet and support an initial comparison. Engineering must validate the complete application and operating conditions.
No. The STEP file is supplied for preliminary layout only. The definitive drawing follows application confirmation, including speed, divisions, motor power and reducer type.
Products
Compare nearby published models before sending the application for technical review.
MI-130
Ø 650 mm · 4.350 N
MI-160
Ø 800 mm · 5.000 N
Send the process data to the technical-commercial team and receive an initial orientation without replacing engineering validation.